|
|
 |
| Civil Engineering Department |
| |
 |
Responsible for construction, maintenance and repairs of all types of civil constructions of MMB.
|
 |
Undertakes construction of new buildings and port infrastructure |
 |
Works undertaken through MMB’s own funds. |
 |
62 works worth Rs.9.55 crores are in progress. |
 |
Annual Budget of Rs.14 crores provided by MMB. |
 |
Around 300 passenger jetties - Detailed survey being undertaken to confirm present status. |
|
| |
| |
COASTAL PROTECTION WORKS |
| |
 |
Coastal Protection Works are carried out through Coastal Engineer under PWD and funds are provided through DPDC (Rs.15-20 crores) |
 |
There is no State Level Scheme to provide for coastal protection. |
 |
Out of total 720 kms. of coastline, 400.49 kms. is naturally protected and 141.84 kms. has been artificially protected. The remaining 177.67 kms. is vulnerable to erosion and needs to be protected
|
 |
is proposed. Funds required to protect 177.67 kms. is Rs.1322 crores over next 15 years. A State Level Scheme |
 |
Maintenance funds are not provided till date. So, Rs.30 crores per year for next three years and thereafter Rs.15 crores per year are required.
|
|
|
|
|